Laserfiche WebLink
Staff Report Addendum <br />February 13, 2009 <br />611 Edgewater Place <br />COA #2008-1030 <br />I met with Peter Payne, the Program Manager -Lead Hazard Grant, concerning the <br />questions raised by the Commissioners from the January 26, 2009 meeting. <br />1. The Commissioners want to know if the entire house is being considered for vinyl <br />,siding and if the dollar amount allotted will be enough to do'the entire house? <br />The amount of funding available is $24,999.00 and Mr. Payne stated that is enough to do <br />the entire house and the garage. <br />2. Are all of the painted surfaces going to be clad in vinyl and by what method will <br />the vinyl be attached to the house? <br />The soffit, fascia, window frames, trim and frieze board will be wrapped in aluminum. <br />The vinyl cedar shake siding will be nailed over % inch Styrofoam insulation to the body <br />of the house. The siding will be fitted around the windows and doors using 1 inch wide j - <br />channels. Please see brochure. <br />3. What are the locations of the windows to be replaced and what will the <br />replacements look like. <br />All of the first floor windows are to be replaced with Vinyl Craft Windows 900 Series <br />that will replicate the original muffin patterns. This will include the 16 single lite <br />casement windows on the front porch, the four 6 over 1 double hung windows on the <br />interior wall of the enclosed front porch and the rest of the windows on the first floor: <br />West side: 2 side by side 6 lite windows; 1 divided window 25% top/75% bottom; Rear <br />West 1 over 1. East side: 2 6 over 1 double hung windows that appear to be <br />replacements; Rear East 2 side by side single lite windows. Product brochure enclosed. <br />4. Is there a contract? <br />It is anticipated that the contract will be signed and notarized on February 23 when it is <br />awarded. <br />Mr. Payne will be in attendance on February 23. <br />Catherine D. Hostetler, <br />Director <br />