Laserfiche WebLink
The applicable Federal guidelines from the Secretary of the Interior's standards for the rehabilitation of historic <br />buildings are: "Replacing in-kind an entire feature of the roof that is too deteriorated to repair — if the overall form <br />and detailing are still evident — using the physical evidence to guide the new work. Examples can include a large <br />section of roofing, or a dormer or chimney. If using the same kind of material is not technically or economically <br />feasible, then a comparable substitute material may be considered." <br />RECOMMENDATION <br />Roof. The mansard roof on the main portion of the house is covered with red, gray -green and blue-green scalloped <br />and rectangular slates with diamond and flower patterns. The exposed fasteners are showing signs of corrosion and <br />some slated have slipped. Some portions of the starter rows have been replaced with new slates, but water <br />infiltration continues to be a problem. The contractor is concerned that much of the slate will crack during removal <br />precluding reuse of all of the existing 130 -year-old roof slates and having a patchwork -like end result if new slate <br />was interspersed with the old. The other factor is the additional cost of all new slate — about $21,000 above the cost <br />of the synthetic slate. <br />The contractor has worked with an ECOSTAR representative to replicate the colors, tile shapes and design patterns <br />of the existing slate roof in the synthetic slate product. Both the local and federal standards do not preclude the use <br />of an alternative material as long as it is a comparable substitute material or duplicates the original. The re -roof of <br />the rear hipped roof with synthetic slate and the siding of the dormer with the slate will be consistent with the style <br />and character of the main portion of the house. The proposed alterations will not increase the height of the <br />building, alter the stylistic character and form of the fagade and the mansard roof, or adversely affect the structural <br />stability of the house. Staff recommends granting approval. <br />Chimneys: There are six chimneys on this building. Two are finely corbelled and will remain. The four others are <br />utilitarian, have been modified, and were added at a later date. The contractor proposes to remove three of these <br />utilitarian chimneys. They are also no longer in use. One is located next to the rear dormer (See photo 5 and 12) <br />and it appears that the interior unglazed bricks have been exposed and are spalling (photo 12). It is a main culprit <br />of water infiltration. The other two are located on the northeast side of the house and rear addition (see photo 7). <br />These three chimneys cannot be seen from the most prominent fagades seen from West Washington and the parking <br />lot to the west of the house. The removal of the chimneys will not increase the height of the building, alter the <br />mass, proportions or character or its main fagades, or adversely impact the structural stability of the building. Staff <br />recommends approval for this portion as well. <br />