Laserfiche WebLink
NOTES: <br />1. THIS DRAWING IS INTENDED TO ILLUSTRATE THE SCOPE OF THE PROJECT AND TO SPECIFY CERTAIN CRITERIA. <br />FINAL CONSTRUCTION PLANS WILL BE GENERATED BY THE CONTRACTOR. <br />2. BRICK SHALL MATCH ORIGINAL FOUNDATION AS CLOSELY AS POSSIBLE. <br />D & ALL PAINTING SHALL BE IN ACCORDANCE WITH HISTORIC LANDMARKS FOUNDATION OF INDIANA GUIDELINES. <br />TITLED: 'EXTERIOR WOOD PAINTING PROCEDURES NECESSARY TO OBTAIN A 12 TO 15 YEAR PAINT JOB'. <br />3 -COLOR PAINT SCHEME: TBD. <br />C <br />A <br />TI/�1T PITCH <br />P TO <br />CERT�INTSLQ'1 7 <br />IDI ' <br />1 T T� U"u G. ; <br />I <br />EXISTING WROUGHT IRON RAILING. <br />EXISTING CONCRETE STOOP <br />SIDE ELEVATION <br />[SOUTH SIDE] <br />DSIZE 03/06/03 8 1 <br />