Laserfiche WebLink
MEKUS STAIOS <br />COST <br />M BUDGET <br />Demolition - Building Skin <br />$ <br />70,000 <br />Site Cleaning <br />$ <br />5,000 <br />Excavation <br />$ <br />12,000 <br />Waterproofing <br />$ <br />15,000 <br />Foundation Repair <br />$ <br />25,000 <br />Stone Repair <br />$ <br />30,000 <br />Rough Carpentry <br />$ <br />200,000 <br />Finish Carpentry <br />$ <br />150,000 <br />Exterior Skin <br />Stucco <br />$ <br />75,000 <br />Half Timber <br />$ <br />50,000 <br />Roof <br />$ <br />180,000 <br />Windows <br />$ <br />80,000 <br />Doors/Frames <br />$ <br />15,000 <br />Plaster <br />$ <br />100,000 <br />Wood Trim <br />$ <br />80,000 <br />Painting <br />$ <br />50,000 <br />Ceramic Tile <br />$ <br />5,000 <br />Carpet <br />$ <br />15,000 <br />Wood Floor <br />$ <br />30,000 <br />Elevator <br />$ <br />65,000 <br />HVAC <br />$ <br />30,000 <br />Plumbing <br />$ <br />25,000 <br />Fire Protection <br />$ <br />10,000 <br />Electrical <br />$ <br />50.000 <br />Subtotal <br />$1,367,000 <br />Contingency 15% <br />$ <br />205.050 <br />Subtotal <br />$1,572,050 <br />General Conditions/OHP 15% <br />$ <br />235.808 <br />Total <br />$1,807,858 <br />0 <br />