Laserfiche WebLink
West Elevation <br />South Elevation <br />• During reconstruction do not restack log <br />gale end. From top of wall to roof deck, <br />frame and install horizontal laps siding. <br />• Replace window with six light sash on <br />sliding track or hinged. See drawing number <br />3. <br />• Install sleeper log. Tag marked "2". <br />• Replace three logs with properly notched <br />and properly hewn log. Tags marked "2". <br />Reuse log in locations where shorter logs are <br />required. <br />• Install bargeboard siding.in gable end. <br />• Install proper sill log on pier foundation. <br />• Replace two logs with properly notched <br />and properly hewn log. Tags marked <br />"2". Reuse logs in location where <br />shorter logs are required. <br />• Splice repair using "T" splice. Tags <br />marked "5". <br />• Replace window with six light double <br />hung sashes are to be through mortise <br />and tennon with [runnels. See drawing <br />number 3. <br />• Re -trim window. <br />