My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2005
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2005
>
November 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:12:09 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEKUS STUUrUS <br />The existing building is currently vacant and no longer serves the administrative <br />4 needs of the cemetery. These activities are housed in the administrative office of <br />Highland Cemetery, which is right across the street. <br />1. Front Elevation 2. Side Elevaunn The Gatehouse (1,2,3,4) has not been maintained and is in severe disrepair. The <br />sidewalks around the building are cracked and have experienced differential set- <br />n tlement. <br />a <br />? The solution is to replace the sidewalks and replace some of the asphalt paving to <br />create positive drainage away from the building. New landscaping is needed to <br />enhance the site. The foundation wall needs to be excavated to expose the wall <br />a Rear EWMon 4. sideElevabon for new waterproofing on the wall. The addition of drain tile would also help move <br />water away from the basement walls. The foundation wall needs to be rebuilt <br />underneath the low porch wall (5). As for the building, the entire skin needs to be <br />removed and rebuilt. The stone walls are in decent condition, but all trim, slate, <br />gutters, walls and windows need replacement, stripped down to bare structure <br />` <br />;q. Y and rebuilt. (6) <br />a <br />5 Foundation Wall Y <br />7 Chimney <br />6 Exterior <br />Replacement of stone chimney is needed (7). The roof and building envelope is in <br />desperate need of repair. Windows are broken and rotten (8), the stucco is <br />cracked and significant areas of wood trim and half timber are rotten. There are <br />numerous holes in the roof allowing the elements to the inside. <br />The Gatehouse has stone foundation walls which are deteriorating under the <br />porch wall (5). Additionally, the stone walls show signs of moisture infiltration. <br />All windows are simple pane glass in wood, double hung sash. Many sashes and <br />glass panes are broken, allowing the elements to get inside(8). All windows should <br />be replaced with an insulating glass unit with aluminum exterior cladding in dou- <br />ble hung configuration. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.