My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2004
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2004
>
May 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:11:38 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GREAT <br />L AKES <br />From the Df_-kTbp Of: <br />Greg W, Lemcke <br />Sole Proprietor <br />Phone Cell <br />CON <br />NJ, M <br />110N (574) 256-20011 (574) 276-3390 <br />4/u/2aM <br />Ouote to Salvage Detached Storage Shed <br />Cecilia Cunningham <br />909 Riverside Drive <br />South Bend, Indiana 46616 <br />Dear Cecilia, <br />It was a pleasure meeting you. Thank you for sharing your morning with Gizmo—dog and I. . <br />We propose to furnish all labor and materials to salvage your outbuilding as follows: <br />• Shore up salvageable portions of existing storage shed to save as can. <br />• Tear -out existing infested/ rotted shed walls, flooring, framing, joists & roofing <br />and haul away, tam due care torp otect salvageable components and surroundings. <br />• Install new treated supports in post and beam fashion to properly support the structure. <br />• Install new Fir T&G flooring & wall framing members as required to repair rotted wood. <br />• Existing shed wall material appears to be a 1x6 "Ship Lap" Fir Siding and shall be <br />replaced with similar materials as are available thru local suppliers. - <br />• Install new roof framing & decking upgrading roof to "Northern" snow load standards. <br />• Install 30 Ib felt over roof decking. <br />• Install GAF Weatherwatch`" Ice & Water Shield at guttered perimeter. <br />• Install white "D" style drip edge around perimeter of roof. <br />• Shingle to match pre-existing shed roofing material <br />(No extra charge to shingle matching house w/client supplied composite slate replicates). <br />• Cover all exposed wood with 2 coats first quality solid stain, (Clients choice of color). <br />• Remove all job related debris. <br />The total price for the above is $6863.00 <br />I appreciate the opportunity to serve you. If I can be of further assistance please let me know. <br />Thank you for your consideration <br />Yours Truly, <br />Creg C-0.. -Demcke <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.