My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 2004
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2004
>
February 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:11:26 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Hammond -Nash <br />January 28, 2004 <br />Page Two <br />Bend Department of Public Works and the U.S. Army Corps of Engineers. <br />Next we began to discuss revising the retaining wall construction as shown on the <br />U.S. Army Corps of Engineers Plans. A detail of Northern Indiana Construction Co., <br />Inc.'s revised wall design was reviewed along with reasons for the modification. The <br />primary reason to revise the design is to provide'a cast -in-place structural concrete <br />retaining wall instead of a composite masonry unit and concrete wall. The proposed wall <br />design will allow the retaining wall to be backfilled sooner and will help get protection <br />around damaged susceptible tree roots. The new wall design eliminates the construction <br />joint located between the two types of construction. This construction joint creates a <br />shear plane and.a weak. spot betz,een the masonry and concrete walls. The proposed <br />retaining wall design is more economical for the City of South Bend and provides a <br />stronger retaining wall. Mr. Oxian requested that concrete pieces from the old wall be <br />incorporated into the masonry facing on the new wall. Northern Indiana Construction <br />Co., Inc. agreed to try to utilize the concrete pieces or sections that will fit the facing <br />concrete needed. Z <br />A letter is being written to Mr. Carl Littrell, City of South Bend Engineer, <br />requesting revision to the plan details for the retaining wall reconstruction. The request <br />will include the proposed cast -in-place retaining wall section as well. as the cost savings <br />to the City of South Bend if the proposed changes are accepted. Mr. Littrell will be asked <br />to issue a request to the 'Historic Preservation Commission to modify the current <br />Certificate of Appropriateness. Mr. Litrell will be made aware of the scheduled meeting, <br />February 9; 2004 to review the request and take a vote to modify the Certificate of <br />Appropriateness, and that his immediate attention and cooperation in issuing the request <br />to modify will be greatly appreciated. <br />Please contact me if you have any questions relating to the items detailed in this <br />letter. <br />Sincerely, <br />Northern In a Construction Co., Inc. <br />David J. Walorski, President <br />
The URL can be used to link to this page
Your browser does not support the video tag.