My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2003
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2003
>
September 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:11:17 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEP -09-2003 10:25 WCS INDIANA OFFICE 5742877711 P.03i20 <br />r <br />DIVISION 8- DOORS St WINDOWS, <br />SECTION 08520- ALUMINUM WINDOWS <br />3. Performance Grade: 50. <br />C. Condensation -Resistance Factor: Provide aluminum windows tested for thermal performance <br />according to AAMA 1503, showing a CRF of not less than 56, where windows are indicated to <br />be "thermally improved," <br />D. Thermal Transmittance: Provide aluminum windows with a whole -window U -value maximum <br />indicated at 15 -mph (24 -km/h) exterior wind velocity and wintercondition temperatures <br />when tested according to AAMA 1503. <br />1. U -Value: Not more than 0.64 Btu/sq. ft. x h x deg F (W/sq. m x K). <br />E. Thermal Movements: Provide aluminum windows, including anchorage, that accommodate <br />thermal movements of units resulting from the following maximum change (range) in ambient <br />and surface temperatures without buckling, distortion, opening of joints, failure of joint <br />sealants, damaging loads and stresses on glazing and connections, and other detrimental <br />effects. Base engineering calculation on actual surface temperatures of materials due to solar <br />heat gain and nighttime -sky heat loss. <br />1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C) <br />material surfaces. <br />1.5 HISTORICAL PRESERVATION DESIGN REQUIREMENTS <br />A. Jefferson Intermediate Center is a Historical Building on the register of the Historic Preservation <br />Commission of South Bend St St. Joseph County. The intent of the design is to match the sizes, <br />profiles, and configuration of existing windows and components (frame, sash, casing, brick <br />molding, muntins, and square inches of daylight opening) as closely as possible. Setback of <br />new window frames from face of existing brick should be the same as the setback of the <br />existing wood windows. Daylight opening of new windows should be within 2% of daylight <br />opening of existing windows, New metal window panning should be profiled to match the <br />profiles of existing wood window casing and trim members. Window manufacturer and <br />installation contractor shall be experienced in window replacement on buildings with historical <br />preservation requirements. Contractor will be required to provide documentation <br />demonstrating past performance of historical preservation window replacement jobs upon <br />award of contract, CONTRACTOR WILL BE REQUIRED TO SUBMIT SHOP DRAWINGS OF <br />PROPOSED WINDOW SYSTEM WITH THEIR BID- THIS IS A REQUIRED PART OF THE BIDDING <br />DOCUMENTS AND WILL BE USED TO EVALUATE QUALIFIED BIDDERS. BIDS NOT <br />ACCOMPANIED BY SHOP DRAWINGS WILL NOT BE CONSIDERED FOR AWARD OF <br />CONTRACT, <br />1,6 SUBMITTALS <br />A. CONTRACTOR WILL BE REQUIRED TO SUBMIT SHOP DRAWINGS OF PROPOSED WINDOW <br />SYSTEM WITH THEIR BID- THIS IS A REQUIRED PART OF THE BIDDING DOCUMENTS AND <br />WILL BE USED TO EVALUATE QUALIFIED BIDDERS. BIDS NOT ACCOMPANIED BY SHOP <br />DRAWINGS WILL NOT BE CONSIDERED FOR AWARD OF CONTRACT. <br />B. Product Data; Include construction details, material descriptions, fabrication methods, <br />dimensions of individual components and profiles, hardware, finishes, and operating <br />instructions for each type of aluminum window indicated. <br />South Bend Community School Corp. 08550-2 07.4965-01 <br />Plan Z and CPF Projects Bid Group 14 <br />Jefferson Intermediate Center Window Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.