My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2003
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2003
>
May 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:16 PM
Creation date
6/8/2020 10:11:11 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RE: Riverbank Coordinating Committee Report <br />Carl-Platz,y -Detroit-District,—ArmCorps of Engineers said he has been <br />coordinating with Carl Littrel [City of South Bend], and is presently <br />attempting to obtain final approval from Regional Office for Leeper park <br />- He noted there had been "wall failures". The Corps intends to reconstruct <br />failed portions of the wall and supplement with stone to prevent undermining <br />of wall, building it similar to existing but BETTER, with concrete foundation <br />under, and matching concrete cap over top, as found on existing wall <br />- Essentially ready to go with soliciting of contractor <br />- In final phases of obtaining approval from regional and divisional offices and <br />obtain funding <br />- Current schedule shows Corps, barring long term delays in funding, with <br />contract awarded [hopefully by end of July, 20031 <br />- Original project involved three different reaches: Leeper, North Shore <br />- And Old CSO [Combined Sewer Outfall] #6 [CSO was a small project, <br />estimated at $50,0001 all were to be combined in one <br />- Floodway, permitting, and real estate issues on North Shore led us to break <br />out the North Shore portion and focus on Leeper. Still in planning on North <br />Shore and CSO <br />Background was also given on rip rap, why trees would compromise the <br />----- -- -- - - - -- -- <br />- -- -- - - -structure planned at North -Shore, why angular -stone was preferred over <br />rounded glacial stone, and that Midwestern river bank projects are <br />competing for federal funding against Homeland Security and other issues <br />As of this time, no meeting with other interested parties is set as this appears <br />to be an issue between the City, the Corps, and the IDNR. Patrick and the <br />rest of the Commission were in agreement that we should not "muddy the <br />waters". <br />Commissioner Patrick will follow up on Leeper, NS and CSO and report at <br />next meeting. The end <br />Lynn Patrick <br />
The URL can be used to link to this page
Your browser does not support the video tag.