My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
June 2002
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2002
>
June 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:23 PM
Creation date
6/8/2020 10:10:48 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(219) 271-7182 or (219) 271-7197 <br />Fax: (219) 271-7315 <br />1 (800) 525-3452 <br />SOLD TO: <br />Beverly Wheeler <br />1512 E. Wayne <br />South Band, In. 46615 <br />Date: May 30, 2002 <br />M <br />SALES AGREEMENT <br />2023 SOUTH BEND AVENUE <br />SOUTH BEND. INDIANA 46631 <br />Phare: 233-7278 <br />Install the following twelve (12) solid vinyl replacement windows with double layer of "soft coat" Low E with Argon <br />insulated glass. Ten (10) casement windows with ten (10) full screens (these are to be the # 13 brand MVP Smart Weld) <br />with white interior and white exterior and two (2) casement windows with two (2) full screens (these are to be the # 16 brarm <br />Royal Seal) with white exterior and stainable paintable raw oak interior. All windows are to have white/white colonial grids <br />("sculptured grids") Note: All ten (10) lower level windows are hinged on the right when viewed from the outside. Two (2) <br />upper north windows (1) hinged on the right and (1) is hinged on the left viewed from the outside. <br />All windows are to have the "fold down" handles. For the three (3) basement windows install glass blocks with vents <br />("04x -ora Style"). <br />Window installation is to include: Removal of existing wood sash (main frame remains intact), installation of new vinyl <br />window into existing frames, packing of insulation around entire perimeter of windows, seal windows with silicone, trim of <br />exterior of silt and frame of windows with aluminum (color: white), clean up and haul away all debris, insulate window <br />weight cavities. Yard sign for 45 days. <br />Material & Labor S 6,660.00 <br />Tax $ 266.00 <br />Total $ 6,926.00 <br />6/03/02 Dep Ck# 1844 S 3.500.00 <br />F. Barany Balance $ 3,426.00 <br />Added 0 basement window S 300.00 <br />With glass block New Balance S 3,726.00 <br />TERMS' 50% Deponit - Balance on installation <br />INSTALLATION DATE: 3-5 Weeks <br />is <br />
The URL can be used to link to this page
Your browser does not support the video tag.