Laserfiche WebLink
MADISON SCHOOL <br />PROJECT REPORT <br />7/2001 <br />1) Courtyard Addition on the South Fagade is framed. The second story portion is being <br />bricked with window openings framed in stone. <br />2) The leaded, arched window units are being replaced. New windows are completely installed <br />on south fagade. Mutins and arch design look great. <br />3) Several more units of the Pella replacement windows have been installed, all have complete <br />trim work now, except for the mutins. I have emailed John Arndt of Hebard and Hebard re- <br />garding the mutins and when they are expected to be installed. <br />4) The north fagade addition is fully framed and cladded in brick with the diamond brick de- <br />sign. The door way is currently being framed. <br />The staff will continue to give monthly progress reports for this project and will keep in eye on <br />the window situation. <br />