My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 2001
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2001
>
August 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:22 PM
Creation date
6/8/2020 10:10:16 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MADISON SCHOOL <br />PROJECT REPORT <br />7/2001 <br />1) Courtyard Addition on the South Fagade is framed. The second story portion is being <br />bricked with window openings framed in stone. <br />2) The leaded, arched window units are being replaced. New windows are completely installed <br />on south fagade. Mutins and arch design look great. <br />3) Several more units of the Pella replacement windows have been installed, all have complete <br />trim work now, except for the mutins. I have emailed John Arndt of Hebard and Hebard re- <br />garding the mutins and when they are expected to be installed. <br />4) The north fagade addition is fully framed and cladded in brick with the diamond brick de- <br />sign. The door way is currently being framed. <br />The staff will continue to give monthly progress reports for this project and will keep in eye on <br />the window situation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.