My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 1999
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1999
>
August 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:22 PM
Creation date
6/8/2020 10:09:32 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recommendation: <br />The staff recommends that this project be accepted and approved with attention to the specifics in the <br />standards. <br />Herman Beyer who was the first Superintendent of the South Bend Park Department laid out the <br />park, fountain, etc. All fire houses in the city at the time of the turn of the century has flower beds, and most <br />had fountains. It is impressive, important and quite fortunate that we still have at this location traces from the <br />past which provides for the rehabilitation of same for the future. <br />This project should carry the full support of this commission and the recognition of Jennifer <br />Moorehead for her unselfish giving of her time for the rehabilitation of this very important and special project <br />which will preserve for future generations a portion of our irreplaceable past. <br />Page: 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.