My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AOM 01-02-97
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1997
>
AOM 01-02-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 3:26:37 PM
Creation date
10/8/2012 3:59:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Annual Organizational Meeting - January 2, 1997 <br />6. 1996 ACCOM[PLISHNIENTS (Cont.) <br />During the year four buildings were <br />completed in the Blackthorn Corporate Park: <br />Sullivan Advertising, Nephrology, The Blue <br />Heron Event Center, and the Jack Young <br />Building which is occupied by Orion, a <br />software engineering firm. All these <br />buildings are occupied, but they are not <br />totally completed. Landscaping will be <br />completed in early 1997. She noted that <br />Peterson Engineering is currently under <br />construction. The construction of that <br />building brings the total number of buildings <br />to five, under construction or near <br />completion, in the first year in the Blackthorn <br />Corporate Park. <br />She noted that Redevelopment entered into <br />the Contract for Sale of Land for the Quality <br />Suites Hotel at Blackthorn which will be a <br />five -story building with 150 suites. <br />Mrs. Kolata noted that Redevelopment has <br />received a grant totaling $4,900,000, from <br />the Transportation Finance Authority for the <br />construction of an inter -change at St. Joseph <br />Valley Parkway and Nimtz Parkway. The <br />grading work has begun and the construction <br />work will be bid in March 1997 and <br />completed by the end of 1997. <br />She noted that Garphyttan Wire, the first <br />industrial building in the International Center <br />located east of the corporate park on Nimtz <br />Parkway has been completed. <br />The last two lots in the Toll Road Industrial <br />Park have been sold to Elumatec and <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.