My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
October 1997
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1997
>
October 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:08:58 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATE OF APPROPRIATENESS STAFF REPORT <br />• APPLICATION -- 1997-0911 <br />PROPERTY -- Leeper Park <br />South Bend, IN <br />OWNER -- City of South Bend Parks Dept. <br />DESIGNATION -- LL <br />RATING -- Significant S/12 <br />STATEMENT OF SIGNIFICANCE/HISTORIC CONTEXT <br />In 1895 the City of South Bend purchased a large parcel of land on the east <br />side of Michigan Street for the establishment of the Water Works who located <br />and capped artesian wells there, thus, rendering the land usable for <br />recreation. By 1900 the area around the Water Works had become referred to as <br />Leeper Park. The following year, extensive plans and site development were <br />undertaken. The zoo and lily pond were constructed in 1902. In 1904 the log <br />cabin was moved into the park from 123 West Northshore Drive. This building <br />was rehabilitated and established as the "Pierre Navarre Cabin. <br />In 1905 additional lands were acquired between Michigan and Lafayette Streets <br />where they developed tennis courts. The following year acreage was added <br />completing the west end of the park and a year after that the connecting <br />wooden bridge was washed away and.replaced with a new structure of iron and <br />concrete. By this time the zoo located at the east end of the park boasted <br />• 132 animals of 50 varieties and the pond in the middle section of the park was <br />stocked with ducks and geese. <br />In 1911, the Park Board engaged George Kessler of St. Louis for the <br />development of master plan for the City's park -boulevard system. The present <br />North Pumping Station and its reservoir were constructed in 1912. The present <br />Michigan Street Bridge was constructed in 1915 as part of the Park -Boulevard <br />plan proposed by George Kessler. During the Great Depression extensive work <br />was done in the park funded by the Works Progress Administration (WPA). <br />including the reconstruction of the retaining walls around the island which <br />utilized salvage material from the earlier bridge. <br />PROPOSED CHANGE <br />Applicant proposes to replace trees that were removed some time ago by <br />planting a tree, Maple -Norway, in the duck pond area. <br />STANDARDS <br />The Preservation Guidelines for Local Landmarks state: <br />Building Site and Landscaping <br />2. Recommended <br />New site work should be based upon actual knowledge of the past appearance of <br />the property found in photographs, drawings, and newspapers. <br />RECOMMENDATION <br />The owner proposes to replace already removed dead trees with Maple trees in <br />the duck pond area. Being that it is an appropriate replacement of something <br />• that was previously there the Staff recommends approval of the planting of new <br />trees. <br />DBD <br />10/3/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.