My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1995
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1995
>
November 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:23 PM
Creation date
6/8/2020 10:08:27 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001403
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1-20-y5 106:43 ID=2192370910 P.02 <br />Van Overberghe <br />Builders, Inc. <br />General and Carpentry Contractors <br />53922 Olive Road South Bend, Indiana 46628 Phono (229) 289-0341 <br />PROPOSAL SUBMITTED TO PHONE DATE <br />10-6-95 <br />ANN KEMP JOB NAME <br />1202 LINCOLN WAY EAST <br />SOUTH BEND, INDIANA 46618 JOB LOCATION <br />wrrrrl.I.ir w�irrwrwrrrir r,..,wrrrrwrrwwwr!lar..rr..rrwrrwiwlrrrrrrr ww rrrwlwrrrr <br />We hereby submit :specifications and estimates fort REPAIRS AS FOLLOWS, <br />1. REPAIR CRACKED AND SPLIT RAFTERS AND COLLAR TILS. <br />SEVEN HUNDRED FIVE DOLLARS ($705.00). <br />2. REPLACE/REPAIR SIDING AND EXTERIOR TRIM AS NECESSARY. <br />ONE THOUSAND FIVE HUNDRED FORTY FIVE DOLLARS ($1,545.00)= <br />3. RESHINGLE SOUTH SIDE ROOF, INSTALL SHINGLES ON ALL OTHER SIDES WHERE <br />THERE ARE HOLES VISIBLE. <br />ONE THOUSAND FOUR HUNDRED SIXTY FIVE DOLLARS ($1,465.00). <br />4. PAINT EXTERIOR OF BUILDING. <br />ONE THOUSAND TWO HUNDRED FORTY DOLLARS ($1,240.00). <br />�. TO STRAIGHTEN WALLS AS MUCH AS POSSIBLE. WE WILL PROBABLY NOT BE <br />ABLE TO STRAIGHTEN COMPLETELY. WOULD BE DONS ON A TIME AND MATERIAL <br />BASIS. TIME AT $32.00 PER MAN PER HOUR AND MATERIAL AT COST PLUS <br />15%. <br />BUDGET TO DO WORK— $3,840.00 LABOR AND $500.00 MATERIAL. <br />rwrrraaaahrrwrrrrrr wwiKl�lyrrrwarirrMaarrrrrrrrrrwlr lA<rwrrrrirrr rillaw Vrrrrrra <br />All material is guaranteed to be as specified. All work to be completed <br />in a workmanlike manner according to atandard practices. Any alteration <br />or deviation from above specifications f'nvolving extra costs wi31 -become- <br />an extra charge over and above the estimate. All agreements contingent <br />upon strikes. accidents or delays beyond our control. Owner to carry <br />fire, tornado and other necessary insurance. Our workers are fully <br />covered by Work <br />en's Compeniwidrawn <br />I ranee. <br />-- <br />Authorize Signature (Van Oghe Builders. Inc.) <br />NOTE: in proposal may be if not accepted within 30 days. <br />! a a a a a r r r r r r r r r r r• M a a Y w r r r r r r! r ri. a a w r r s r rr r r r r r s a A r r r r a r r r r r rls a r r w r r r r r r <br />ACCEPTANCE OF PROPOSALS The above Prices, specifications and conditions <br />are satisfactory and are hereby accepted. You are authorised to do the <br />work as specified. Payment will be made as outlined above. <br />Signature Date of Acceptance <br />Signature <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.