Laserfiche WebLink
l.nKllriUAln Ur AYYKUrXIAIhNh6S STAFF REPORT <br />development and provision of open space for the project as a whole as laid out <br />by the developer. <br />The Staff therefore recommends that the commission approve the demolition of <br />the boiler house and its smokestack only with the provision that documentation <br />of this structure be prepared submitted by the developer prior to demolition. <br />The scope of this documentation should be guided by the standards Set forth <br />for the Historic American Buildings Survey (NABS). <br />David B. Duvall <br />8/10/94 <br />Page 2 <br />