Laserfiche WebLink
FIXTURE MOUNTS TOP COURSE INSTALLATION <br /> • Celect fixture mounts are available for • Depending upon the trim you choose to you use to <br /> obstructions such as lighting, dryer vents, water finish the top of the wall, measure and cut the top <br /> faucets, etc. Begin by installing the base "ring". course panel to fit. A freeze board, finish or gable • <br /> Install the siding panels allowing for the trim can be applied to cover the fasteners a give a <br /> appropriate expansion gap depending upon the finished appearance. <br /> length of the siding course. Center and secure • Install the panel securing it by placing nails along <br /> the face plate with two Celect Cortex trim screws the cut edge of the panel approximately every 16". <br /> and plugs (Fig The head of the nails will hold the panel back to the <br /> 10) wall and the shaft of the nail will keep the panel <br /> • Fixturefrom raising and becoming unlocked from the panel <br /> mounts can below it (Fig 12). Pin each panel in place by placing <br /> also be field r---1one nail through the panel itself toward the middle <br /> constructed Base of the panel (Fig 13). <br /> using L_J <br /> Cellular <br /> PVC, wood, <br /> etc. Allow <br /> for the Cover Plate <br /> appropriate - <br /> 3/8" Fig. 10H / i' 1/4,y" �\ <br /> expansion <br /> gap. <br /> ROOF LINES Fig. 12 -- -7 A <br /> • When working up over roof lines, hold the shake v11/4" <br /> panels off the roof line a minimum of 1/2". No \ <br /> additional trim is needed. (Fig. 11) <br /> Finish Trim <br /> 1/2" off of or <br /> pppr- <br /> roofline <br /> Gable trim <br /> with no <br /> channel. <br /> Pin the center <br /> Tuck behind <br /> fascia •, <br /> i Fig 13 , <br /> Fig.11 .;-.. L �- <br /> _10 <br /> 44 45 <br />