Laserfiche WebLink
PANEL INSTALLATION • <br /> • The length of the panel should be 1" from the top PANEL INSTALLATION CONT'D <br /> furring and a minimum of 1/2" over the foundation • Continue installing panels across the wall making <br /> at the bottom (Fig. 5) certain that 1)the lock is fully engaged and 2)the <br /> • Install the first panel by placing the cut edge along panel is "pinned" into place by 1 fastener within <br /> the chalk line. 12" of the bottom of the panel. <br /> • Hold the panel in place by placing the first fastener • For the best look, make sure that all the panels are <br /> at the top of a nailing slot no more than 12" from even across the bottom of the wall. <br /> the bottom edge of the panel. Do not drive tight. When cutting and installing around windows, <br /> the panel.approximately 1/32" between the head and • <br /> doors, etc., allow for 1/2" gap along any vertical <br /> the cuts always and 1/2" along horizontal cuts up to 8' <br /> • Make sure the panel is plumb and continue and 1" beyond 8' (Fig 7) <br /> fastening it placing the fasteners in the center of <br /> the slots at 8"-12" intervals (Fig. 6) <br /> li <br /> i <br /> 1" Gap i t f- <br /> 11 1 III I. <br /> I 1 <br /> other <br /> 4 Center of all 1/2" gap on vertical <br /> slots 1— <br /> cuts <br /> at 8" 12"intervals I <br /> I I \1/2^ gap on <br /> i I t i <br /> 11 horizontal cuts up to <br /> 8' from pin nail. <br /> \ k <br /> 1-1" gap beyond 8' <br /> RP Top of 1 slot I <br /> within 12" <br /> from bottom. Fig. 7 �` a/ �� <br /> Fig. 6 i( <br /> .s1 <br /> 33 <br /> 32 <br />