Laserfiche WebLink
PANEL INSTALLATION <br /> • The length of the panel should be 1" from the top PANEL INSTALLATION CONT'D <br /> furring and a minimum of 1/2" over the foundation <br /> at the bottom (Fig. 5) • Continue installing panels across the wall making <br /> • Install the first panel by placing the cut edge along certain that 1)the lock is fully engaged and 2)the <br /> the chalk line. panel is "pinned" into place by 1 fastener within <br /> • Hold the panel in place by placing the first fastener 12" of the bottom of the panel. <br /> at the top of a nailing slot no more than 12"from • For the best look, make sure that all the panels are <br /> the bottom edge of the panel. Do not drive tight. even across the bottom of the wall. <br /> Leave approximately 1/32" between the head and • When cutting and installing around windows, <br /> the panel. doors, etc., allow for 1/2" gap along any vertical <br /> • Make sure the panel is plumb and continue cuts always and 1/2" along horizontal cuts up to 8' <br /> fastening it placing the fasteners in the center of and 1" beyond 8' (Fig 7) <br /> the slots at 8"-12" intervals (Fig. 6) <br /> - <br /> -4---_____1" Gap ' 1 <br /> ! � <br /> i I f � i 1 ■1 <br /> Center of all other , I <br /> . slots 4- —1/2" gap on vertical <br /> at 8"-12"intervals.. 4:1cuts <br /> ii—1J1 II \1/2„ gap on <br /> (____ + i horizontal cuts up to <br /> 1 _i 8' from pin nail. <br /> Top of 1 slot � I—1" gap beyond 8' <br /> I within 112! <br /> 2" I <br /> from bottom. Fig 7 '�- 'V <br /> .)/ <br /> , <br /> Fig. 6 0, di <br /> 32 33 <br />