My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:18:19 AM
Creation date
5/27/2020 9:58:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/26/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated May 26, 2020. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — LumU Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $ 36,100.00 <br />compensation: <br />a. Study and Report Phase <br />b. Preliminary Design Phase <br />c. Final Design Phase <br />d. Bidding and Negotiating Phase <br />e. Construction Phase <br />f. Post -Construction Phase <br />based on the following estimated distribution of <br />$ 1,600.00 <br />$ 8,500.00 <br />$ 16,000.00 <br />$ 3,000.00 <br />$ 6,000.00 (6 visits and shop review) <br />$ 1,000.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Pagel <br />Exhibit C —Compensation Packet BG1: Basic Services (other than RP%Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.