My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design and Construction Services Masonry Improvements at WWTP 1, 2, 3, and 4 - Kil Architecture & Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 9:58:50 AM
Creation date
5/27/2020 9:58:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/26/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPENSATION DECISION GUIDE <br />FORUSEWITHEXHIBITCTOEJCDCE-500,2008EDITION <br /> <br /> <br />6 <br />- <br /> <br />5 <br />- <br /> <br />) <br />Packet BC <br />Salary Costs <br />Factor <br />Times a Factor <br />Appendix 1 <br />Salary Costs Times a <br />Packet RPR <br />Appendix 1 <br /> <br /> <br />5 <br />- <br />Fixed Fee <br />Costs Plus <br />Direct Labor <br /> <br />Overhead Plus a <br />4 <br />Packet BCAppendix 1 <br />- <br /> <br />. <br /> <br /> <br /> <br /> <br />4 <br />Times a Factor <br />- <br />Direct Labor Costs <br />Appendix 1 <br />Packet RPR <br />Factor <br /> <br />Direct Labor <br /> <br />Costs Times a <br />3 <br />- <br />Professional Services. <br />Packet BCAppendix 1 <br /> <br />Costs <br />3 <br /> <br /> <br />- <br />Construction <br />Percentage of <br />N/A <br />Packet RPR <br />1 <br />Costs <br /> <br /> <br />Page <br />Construction <br />Percentage of <br />Packet BCN/A <br />Compensation Decision Guide) <br /> <br /> <br /> <br />– <br />2 <br /> <br />1 <br />- <br />Rates <br /> <br /> <br />(Exhibit C <br /> <br />2 <br />- <br />Standard Hourly <br />Rates <br />Packet RPRAppendices and 2 <br />500 Agreement Between Owner and Engineer for <br />- <br />2008 National Society of Professional Engineers for EJCDC. All rights reserved <br />including Resident Project Representative) (as described in Exhibit A, Part I <br /> <br /> <br />pendices 1 and 2 <br />© <br /> <br />Standard Hourly <br /> <br />not <br />Packet BCAp <br />1 EJCDC E <br />- <br />Copyright <br /> <br /> <br /> <br />1 <br />Which method of compensation is to be used?Which method of compensation is to be used? <br />- <br />Lump Sum <br />Sum <br />Lump <br />Packet BCN/APacket RPRN/A <br /> <br /> <br /> <br />Use This Base Compensation Packet Include This Appendix Use This RPR Compensation Packet Include This Appendix <br />Compensation for Basic Services (Decision Question:Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) Decision Question: <br /> <br /> <br />1. 2. <br /> <br />Compensation Decision Guide for Use with Exhibit C to EJCDC E-500, 2008 Edition <br /> Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.