Laserfiche WebLink
<br />7.Services during the Construction Phase rendered after the original date for completion of <br />the Work referred to in A1.05.B. <br />8. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />9. While at the Site, compliance by Engineer and its staff with those terms of Owner's or <br />Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites. <br />Page1 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner anEd ngineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserve d. <br /> <br /> <br />