<br />1.Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any. <br />2. Together with Owner or Owner’s representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />3. Perform or provide the following additional Post-Construction Phase tasks or deliverables: <br />\[Here list any such tasks or deliverables\] <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />3. Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner’s schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required by changes in <br />Laws and Regulations enacted subsequent to the Effective Date or are due to any other <br />causes beyond Engineer’s control. <br />4. Services resulting from Owner’s request to evaluate additional Study and Report Phase <br />alternative solutions beyond those identified in Paragraph A1.01.A.4. <br />5. Services required as a result of Owner’s providing incomplete or incorrect Project <br />information to Engineer. <br />6. Providing renderings or models for Owner’s use. <br />Page9 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner anEd ngineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserve d. <br /> <br /> <br />