Laserfiche WebLink
Project Name: 2020 Curb and Sidewalk Construction <br />Project Number: 120-001 <br />For Bids Due: <br />May 12, 2020 at 9:30am Local Time - see htt s://squthbend gcLv1bidg, for <br />electronic bid submission information p <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />HVISION <br />Item <br />No. <br />B2 <br />Description Quantity Unit Unit Price Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />70 <br />SYS <br />$36.00 <br />$2,520M0 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />70 <br />SYS <br />$84.00 <br />$5,880.00 <br />3 <br />CONCRETE CURB, REMOVE <br />100 <br />LFT <br />$19.50 <br />$1,950MO <br />4 <br />-CONCRETE CURB, MODIFIED <br />100 <br />LFT <br />$43.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />30 <br />SYS <br />$4150 <br />_$4,300M0 <br />$1,305.00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />30 <br />SYS <br />$102.00 <br />$3,060,00 <br />7 <br />TOPSOIL AND SEEDING <br />60 <br />SYS <br />$49.00 <br />$2,940.010 <br />10 <br />TREE, REMOVE, 18 IN <br />1 <br />EA <br />$ 1,050.0O <br />$1,050.00 <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />$ l,550.00 <br />$1,550,00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />1 IN TO 2.5 IN <br />2 <br />EA <br />$675,00 <br />$1,350.00 <br />DIVISION B2 TOTAL $25,905.00 <br />F1JW&11*-1kqRN <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />100 <br />SYS <br />$38.00 <br />$ <br />�3,800.Qo <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />100 <br />SYS <br />$66.50 <br />$6,650.00 <br />3 <br />CONCRETE CURB, REMOVE <br />140 <br />LFT <br />$2100 <br />$3,220,00 <br />4 <br />CONCRETE CURB, MODIFIED <br />140 <br />LIFT <br />$40.00 <br />7 <br />TOPSOIL AND SEEDING <br />80 <br />SYS <br />__$5,600.00 <br />$4100 <br />$3,440.00 <br />10 <br />TREE, REMOVE, 18 IN <br />1 <br />EA <br />$1,050.00 <br />$11050.00 <br />11 <br />TREE, REMOVE, 30 IN <br />3 <br />EA <br />$1,550.00 <br />$4,650.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO 2.5 IN <br />4 <br />EA <br />$675.00 <br />$2,700.00 <br />15 <br />-CURB RAMP, REMOVE <br />16 <br />SYS <br />$81.00 <br />$1,296.00 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />$260.00, <br />$4,160.00 <br />DIVISION B3 TOTAL $36,566.00 <br />FBI VM lork K01 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 - <br />CONCRETE SIDEWALK, REMOVE <br />100 <br />SYS <br />$57.00 <br />$5,700.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />100 <br />SYS <br />$68.00 <br />$6,800.00 <br />3 <br />CONCRETE CURB, REMOVE <br />160 <br />LFT <br />$20.00 <br />$3,200.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />160 <br />LFT <br />$40,010 <br />$6,400.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SYS <br />$65.00 <br />'300,00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />20 <br />SYS <br />$72.00 <br />$1,440.00 <br />7 <br />TOPSOIL AND SEEDING <br />35 <br />SYS <br />$96.00 <br />$3,360.00 <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA <br />$1,050.00 <br />$2,100.00 <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />$1,550,00 <br />§-1,550 0-0 <br />13 <br />STUMP, REMOVE <br />I <br />EA <br />$500.00 <br />$500.00 mm <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO 2,5 IN <br />4 <br />EA <br />$,675.00 <br />$2,700.00 <br />15 <br />-CURB RAMP, REMOVE <br />16 <br />SYS <br />$98.00 <br />$1,568.00 <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />$147,00 <br />$2,352.00 <br />DIVISION C1 TOTAL $38,970.00 <br />Version 01/29/2020 Contractor's Bid for Public Works - 8 <br />