My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 12-04-92
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1992
>
RM 12-04-92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 4:30:08 PM
Creation date
10/5/2012 2:48:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting - December 4, 1992 <br />6. NEW BUSINESS (Cont.) <br />b. continued... <br />Development Area. (Toll Road Industrial <br />Park, Lots 5, 11, 15, and 18b (north <br />portion) <br />c. Commission approval rea <br />Specifications and Desi, <br />for Lot 5, 11, 15, and <br />portion) in the Airport <br />Development Area. (Toll <br />Park) <br />aested for Bid <br />xn Considerations <br />18b (north <br />Economic <br />Road Industrial <br />Mr. Riggs outlined some of the design <br />considerations for these offerings. <br />Construction must begin within one year <br />of award of property; proposals must <br />conform to the Covenants of the Toll Road <br />Industrial Park; building plans, <br />landscaping, on -site parking, etc., must <br />be approved by the Commission's Design <br />Review Committee; project must be <br />completed within 2 years. Mr. Riggs <br />noted that partial sale or lease will be <br />allowed on a pro -rated basis. <br />Mr. Hunt noted that the Covenants for the <br />Toll Road Industrial Park served the <br />Industrial Foundation well and, rather <br />than trying to develop our own, have <br />assumed those. Mr. Piasecki asked what <br />some of those covenants are. Mr. Riggs <br />responded that they cover such things as: <br />the front facade must be at least <br />one -half masonry or brick; landscaping <br />between the street and building; curbed <br />parking lots, etc. <br />Upon a motion by Mr. Donoho, seconded by <br />Mr. Faccenda and unanimously carried, the <br />Commission approved the Bid <br />Specifications and Design Considerations <br />for Lots 5, 11, 15, and 18b (north <br />portion) in the Airport Economic <br />Development Area. (Toll Road Industrial <br />Park) <br />-4- <br />COMMISSION APPROVED THE BID <br />SPECIFICATIONS AND DESIGN <br />CONSIDERATIONS FOR LOTS 5, 11, 15 <br />AND 18B (NORTH PORTION) IN THE <br />AIRPORT ECONOMIC DEVELOPMENT AREA <br />(TOLL ROAD INDUSTRIAL PARK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.