My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 04-10-92
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1992
>
RM 04-10-92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 4:33:58 PM
Creation date
10/5/2012 11:37:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend R development Commission <br />Regular Meet'ng - April 10, 1992 <br />6. NEW BUSINESS (Cont.) <br />g. continued... <br />total of 68,676 square feet of new <br />construction to accommodate the <br />acquisition of new equipment. A 25,000 <br />square foot building will be constructed <br />at the site of the old Colfax Theater for <br />the operation of new newspaper inserting, <br />packaging, and sorting machines. A <br />33,359 square foot Press Building will be <br />constructed in which to operate a new, <br />state-of-the-art press. Also, an 8,141 <br />square foot Newsprint Warehouse and a <br />2,176 square foot footbridge to connect <br />the second floor of the new Press <br />Building to the existing structure will <br />be constructed. The total construction <br />cost is estimated to be $11,500,000. <br />The project will create no new permanent <br />full-time jobs but will maintain two <br />hundred sixty -eight (268) existing <br />permanent full- time.and two hundred <br />fifty-five (255) existing part -time jobs <br />with an annual payroll of $11 million. <br />The Droperty is properly zoned for the <br />prop sed use. The property is located in <br />a Tac Abatement Impact Area and also in a <br />Rede elopment Blighted Area. The <br />prop rty is also located in a Tax <br />Incr mental Financing Allocation Area. <br />The roject qualifies for 10 years of <br />real property tax abatement under the Tax <br />Abat ment Ordinance. <br />With ut abatement the improvements would <br />gene ate approximately $5,421,905 in <br />taxe3 over the ten year period. With <br />abat ment the project will generate <br />appr ximately $2,738,062 in taxes. <br />Ther fore, the amount of the abatement <br />will be approximately $2,683,843. <br />Mr. <br />exci <br />>zarwark noted that this is an <br />:ing project for South Bend. The new <br />s will use a different kind of ink to <br />)ve the physical appearance of the <br />The new inserting machinery will <br />IM <br />
The URL can be used to link to this page
Your browser does not support the video tag.