My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Traffic Control Device - New Installation - (3) Signs on Inglewood Pl., W. Rose St. and W. Bryan St.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Traffic Control Devices
>
Traffic Control Device - New Installation - (3) Signs on Inglewood Pl., W. Rose St. and W. Bryan St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 9:18:57 AM
Creation date
5/13/2020 9:18:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Board of Public Works Meeting Date: May 12, 2020 Traffic Request Number: 20-026 <br />I hereby submit the following installation or change of traffic control devices for review: <br /> New Installation Removal Revision <br /> Stop Sign Stop Sign Stop Sign <br />Yield SignYield SignYield Sign <br />Speed Limit,___mph Speed Limit,___mph Speed Limit,___mph <br /> Other, List Other, List Other, List <br />3 –R7-123 “No Dumping” signs <br />Location(s): Three (3) approximately evenly spaced signs along the west side of Inglewood Place between W. Rose St. and W. <br />Bryan St. (see attached drawing) <br />This has been submitted: <br />In response to request by a citizen/ neighbor/ passerby: <br />In response to contracted reconstruction or improvements <br />In response to developer-provided reconstruction or improvement <br />In response to an internally generated concern from: Jen Early (Code Enforcement) 574-235-5542 <br />Remarks: In response to request from Code Enforcement due to dumping issues <br />Submitted & Proposedby: Recommend Approval/Denial: <br />Kara Boyles <br />Theresa E. Harrison, PE, ENV SPKara M. Boyles, PhD, PE <br />Traffic Engineer City Engineer <br />Date: April 22, 2020 Date: 5/4/2020 <br />APPROVED: SOUTH BEND BOARD OF PUBLIC <br />WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Therese J. Dorau, Member Attest: <br />Jordan V.Gathers, MemberLinda M. Martin, Clerk <br />Joseph R. Molnar, Member Date <br />Distribution: <br />Bureau of Traffic and Lighting <br />Code Enforcement <br />South Bend Police Department Traffic Division <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.