My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
House Move Permit - 1126 Frances-522 Napoleon - Lykowski Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Licenses & Permits
>
House Move Permit - 1126 Frances-522 Napoleon - Lykowski Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 11:00:39 AM
Creation date
4/29/2020 10:28:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROCESS FOR ENERGY CODE COMPLIANCE <br />RESIDENTIAL <br />There are three (3) possibilities for Energy Code Compliance: <br />New Construction (stand alone) <br />Required Document — <br />Energy Compliance Proposal or Energy Compliance Certificate <br />New Construction (addition — conditioned space) <br />Required Document — <br />Energy Compliance Proposal or Energy Compliance Certificate <br />New Construction Sunroorn (addition — unconditioned space) <br />*Permanenl separation bem,een conclitionedspace and aelclilion <br />Required Document -- <br />Energy Compliance Proposal — Sunroorn <br />HOW TO MEET COMPLIANCE: <br />1) PRESCRIPTIVE --- Compliance with a pre -determined set of standards regarding <br />the building envelope based on R Values. <br />2) PERFORMANCE - Compliance by deteri-nining the actual energy use based oil <br />the performance of combined energy use, insulation and heat loss/gain. <br />The Builder or Design Professional can fill out a Prescriptive Energy Compliance <br />I Z� <br />Certificate and nothing more is required. This will be verified at the final before a C of 0 <br />is issued. <br />The Builder or Design Professional can produce either an approved RESCHECK or other <br />approved Performance Based computerized energy program. Verification will take place <br />before a C of 0 is issued. <br />If the Builder or Design. Professional wants to do any kind of trade-off they are required <br />to use RESCHECK or another approved Performance Based energy program. No <br />exceptions! <br />*Please keep window/door energy stickers oil windows/door until Framing inspection is <br />Z:� <br />completed or have available at site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.