Laserfiche WebLink
The main body of the house is to remain intact and functional. No utilities are being terminated at this <br />time- Demolition work being performed (garage and sunroom) is select with 65% of all materials <br />dismantled to be removed, thence, reused at the new site (522 Napoleon), once the main body of the <br />house is moved there. All d:emolition/dis,mantling work to be conducted above grade. <br />