My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Fire Station Nos. 3 & 6 Renovations Proj No. 118-047 - Gibson-Lewis Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 2 - Fire Station Nos. 3 & 6 Renovations Proj No. 118-047 - Gibson-Lewis Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 9:35:02 AM
Creation date
4/29/2020 9:35:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />GjsfTubujpoOpt/4boe7Sfopwbujpot <br />229.1583 <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />5.7.315.39.31 <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />.Mjhiujohvqhsbeftboesfuspgjutbucpuitubujpot4'7<boeBqqCbzbutubujpo4/ <br />.Ofxcbuisppngjyuvsftbutubujpo7 <br />Attachments: (List documents support changerequired) <br />Opof <br />39-671/11 <br />Amount of Increase / Decrease: $____________________ <br />Categories (Pick One): <br />.2:4-611/11 <br />o <br />Scope of Work <br />Previously approved Change Order(s): $___________________ <br />o <br />Differing Site Conditions, Changed Conditions <br />4/19 <br />Current Percent of Change: ____________________ % <br />Conflicted Specifications and Drawings <br />Failed Materials <br />:66-171/11 <br />New Total Amount: $____________________ <br />Error <br />Omission <br />.25/84 <br />Total Percent of Change: ____________________ % <br />Final Quantity Adjustment <br />_______________________ <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDEDBY: <br />EboKpoft5.32.31 <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />1503203131 <br />UpzWjmmb <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />1503303131 <br />BmjdjbD{bsofdlj <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />LbsbCpzmft503303131 <br />City Engineer (Print Name)(Signature)(Date) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.