My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA – Olive Street Water Works HVAC Repairs - ME Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to PSA – Olive Street Water Works HVAC Repairs - ME Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 4:06:54 PM
Creation date
4/16/2020 4:06:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: <br />Linda M. Martin, Clerk <br />Board of Public Works <br />FROM:Zach Hurst,Project Engineer <br />SUBJECT:PSA Amendment–M/E Design Services <br />Olive Street Station Office HVAC Upgrades <br />DATE: <br />April 8, 2020 <br />During repairs to the HVAC system at the Olive Street station office building, it was noted that <br />issues between old and new equipment was causing a constant tripping of a breaker required <br />for function of the system. This amendment to the existing Professional Services Agreement <br />with M/E Design Services accounts for the investigation and design effort required to mitigate <br />the problem. <br />The construction portion of the work is being handled by way of a change order to Ideal <br />Consolidated, which is also scheduled for approval at the same Board meeting. <br />Please call with your questions (MS Teams). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.