My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to Agreement - Construction Services for Morris Theater Emergency Plaster Work - American Structurepoint Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to Agreement - Construction Services for Morris Theater Emergency Plaster Work - American Structurepoint Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:54:11 PM
Creation date
4/16/2020 3:54:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated ,. <br />AMENDMENT TO OWNER-ENGINEER <br />AGREEMENT Amendment No. _____ <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement: <br />b.Owner:Board of Public Works, City of South Bend, Indiana <br />c.Engineer:American StructurepointInc. <br />d.Project:Morris Center of Performing Arts Emergency Plaster Work <br />2.Description of Modifications: <br />\[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments. <br />a.Engineer shall perform or furnish the following Additional Services: <br />American Structurepoint will providetheconstruction administration services <br />required to assist the City of South Bend required to complete the plaster repairs <br />at the Morris Performing Arts Center. <br />b.The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />Provide one site visit to inspect plaster installation mock-up at plaster <br />contractors facility with follow-up report of findings. <br />Provide no more than twoinspections of the dome plaster to determine the extent <br />of repairs required.For the purpose of this proposal it is assumed one inspection <br />will occurduring scaffold installation to keep on schedule and another <br />inspection once scaffold construction is complete. <br />Communication and coordination as required with contractors during repairs. <br />Provide onefinal inspection of repairsuponcompletion. <br />e.For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Page 1 <br />(Exhibit K (Amendment to Owner-Engineer Agreement) Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.