My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emergency CSO Repair - CSO 018 and Backwater Gate Emergency Repair - Selge Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Emergency CSO Repair - CSO 018 and Backwater Gate Emergency Repair - Selge Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:31:43 PM
Creation date
4/16/2020 2:31:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.Interim repair of <br />weir wall with <br />fiberglass <br />installation <br />Theproject cost was $24,430.The Sewer Department was able toprovide sand bags for the <br />project to reduce cost.Since therepair of the weir wall, the Water Works team identified that our <br />flow meters indicate we no longer have infiltration and inflow thru the wall during dry weather <br />conditionsand peak diurnal levels have declined.Prior to the damage of the weir planks we had <br />infiltration andinflow, but these havenow subsided, which is greatnews. <br />S:\\Public Works\\Projects\\Projects by Year\\2020 Projects\\120-017 CSO 018 & Backwater Gate Emergency Repairs\\1-Admin\\1-BPW <br />Documents\\Memo to BPW -CSO 018 Backwater Gate Emergecy Repair.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.