Laserfiche WebLink
3. Interim repair of <br />weir wall with <br />fiberglass <br />installation <br />The project cost was $24,430. The Sewer Department was able to provide sand bags for the <br />project to reduce cost. Since the repair of the weir wall, the Water Works team identified that our <br />flow meters indicate we no longer have infiltration and inflow thru the wall during dry weather <br />conditions and peak diurnal levels have declined. Prior to the damage of the weir planks we had <br />infiltration and inflow, but these have now subsided, which is great news. <br />BOARD OF PUBLIC WORItS <br />Gary A. Gilot, President � <br />•' — v�-- <br />Elizabeth A. Maradik, Member <br />Therese J. Dorau, Member <br />Jordan V. Gathers, Member <br />Joseph R. Molnar, Member <br />ATTEST: <br />6�11/,l r C(1G17 l <br />Linda M. Martin, Clerk <br />S:APublic Works\Projects\Projects by Year\2020 Projects\120-017 CSO 018 & Backwater Gate Emergency Repairs\1 - Admin\1 - BPW <br />Documents\Memo to BPW - CSO 018 Backwater Gate Emergecy Repair.doc <br />