Laserfiche WebLink
3.Interim repair of <br />weir wall with <br />fiberglass <br />installation <br />Theproject cost was $24,430.The Sewer Department was able toprovide sand bags for the <br />project to reduce cost.Since therepair of the weir wall, the Water Works team identified that our <br />flow meters indicate we no longer have infiltration and inflow thru the wall during dry weather <br />conditionsand peak diurnal levels have declined.Prior to the damage of the weir planks we had <br />infiltration andinflow, but these havenow subsided, which is greatnews. <br />S:\\Public Works\\Projects\\Projects by Year\\2020 Projects\\120-017 CSO 018 & Backwater Gate Emergency Repairs\\1-Admin\\1-BPW <br />Documents\\Memo to BPW -CSO 018 Backwater Gate Emergecy Repair.doc <br /> <br />