My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 & PCA - Olive Street Station Office HVAC Upgrades Proj No. 119-077A - Ideal Consolidated, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders & Project Completion Affidavits
>
Change Order No 1 & PCA - Olive Street Station Office HVAC Upgrades Proj No. 119-077A - Ideal Consolidated, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:28:18 AM
Creation date
4/16/2020 2:00:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Number: 119-077A <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Name: Change Order #: <br />Olive Street Station Office HVAC Upgrades 1 <br />_ <br />DATE INITIATED: 3-24-20 BPW DATE: 4-9-20 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Existing boiler hookup conditions were unknown at the time of rework. Once the original scope <br />was completed it was found that the boiler would continuously trip the breaker. Troubleshooting <br />and breaker upgrades were needed to fix the issue. <br />Attachments: (List documents support change — required) <br />Troubleshooting and added work is $2,000.00 <br />Amount of DIncrease / El Decrease: $ 2,000.00 <br />Previously approved Change Order(s): $ 0.00 <br />Current Percent of Change: " <br />New Total Amount: $ 58,500.00 <br />Total Percent of Change: 3.54 <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) <br />REVIEWED BY: <br />Toy Villa <br />Construction Manager (Print Name) <br />APPROVED BY: <br />Zach Hurst <br />Engineering Project Manager (Print Name) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) <br />Categories (Pick One): <br />❑ Scope of Work <br />0 Differing Site Conditions, Changed Conditions <br />❑ Conflicted Specifications and Drawings <br />❑ Failed Materials <br />❑ Error <br />❑ Omission <br />❑ Final Quantity Adjustment <br />11 <br />(Signature) <br />(Signature) <br />(Signature) <br />(Signature) <br />M • 1 <br />(Date) <br />04/06/20 <br />(Date) <br />04/06/2020 <br />(Date) <br />04/07/2020 <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.