My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 & PCA - Vietnam Veterans Memorial Relocation Proj No. 117-047A - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders & Project Completion Affidavits
>
Change Order No 1 & PCA - Vietnam Veterans Memorial Relocation Proj No. 117-047A - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:29:15 AM
Creation date
4/16/2020 1:56:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q4,�pli"9l1 Idp�Ij ,. <br />CITY OF SOUTH BEND, INDIANA <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: 11 /26/2019 <br />PROJECT NO: 117-047A <br />PROJECT NAME: Vietnam Veterans Memorial Relocation <br />CONTRACT DATE: 5/22/2018 <br />CHANGE ORDER NO: 1 (Final) <br />SUBJECT OF CHANGE ORDER: PCR #1-Liquidated Damages <br />All items completed substantially as planned. <br />See attached Comparison of Estimate for overruns and underruns. <br />The original contract sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this Change Order, the project amount is <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />• a- <br />'Contractor- <br />Gerald Longerot - President <br />Printed Name and Title <br />Slatile Roofing and Sheet Metal Co., Inc. <br />Company Name <br />1703 S. Ironwood Dr <br />Address <br />South Bend, IN 46613 <br />City, State, Zip <br />❑ Increased <br />XQ Decreased <br />$ <br />$ <br />152,850.00 <br />0.00 <br />152,850.00 <br />$ 3,000.00 <br />$ 149,850.00 <br />-1.96 % <br />-1.96 % <br />9/11 /2018 <br />0 days <br />0 days <br />9/11 /2018 <br />RECOMMENDED FOR APPROVAL <br />CONSTRIXTION MANAGER <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />U.vy A. Oilol, President <br />Elizabeth A, Mmradik, Member <br />'Therese J. Do—, Member <br />Jord V. (alhen, Member <br />Joseph R. Moliur, Member <br />AITES'l': <br />iar" c4i-;ie <br />Linda M. Madiv, Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.