Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKI <br />CITY OF SOUTH BEND, INDIANA <br />SPECIAL PROVISIONS <br />Main & Colfax Parking Structure <br />Repairs 2020 <br />Project No. 115-143B <br />I. PROJECT DESCRIPTION <br />Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to perform structural repairs according to the intent of the plans and specifications. <br />11. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS <br />The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & <br />CONSTRUCTION STANDARDS, most recent version, are to be used on this project. <br />Each Bid provider is specifically instructed to become completely familiar with the most recent <br />version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION <br />STANDARDS prior to submitting a Bid. <br />Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the <br />2020 INDOT Standard Specifications for the letting effective after September 1, 2019. <br />These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING <br />SPECIFICATIONS. <br />In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING <br />SPECIFICATIONS, the SPECIAL PROVISIONS will govern. <br />Ill. BIDDING REQUIREMENTS <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 102 <br />B. Additions: <br />1. Each Bid provider shall completely execute and submit the following documents with the <br />Bid: <br />a. City of South Bend Contractor's Bid for Public Work Form <br />b. Bid Bond stating 5% of the total Bid or Certified Check of 5% of the bid. <br />c. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment and Certification of use of United States Steel Products or Foundry <br />Products. <br />d. Responsible Bidder Checklist <br />Version 1/30/2020 Special Provisions - 1 <br />