My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - D.C. Byers Co. Detroit Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - D.C. Byers Co. Detroit Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 1:18:34 PM
Creation date
4/16/2020 12:17:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notice is hereby given that the City of South Bend, Indiana, Board of Public VVVrko will receive sealed <br />electronic bids at southbendin.govlbids until 9:30 a.m., Local Time, on April 14, 2020 for the following: <br />Main & Colfax Parking Structure Repairs 2020 <br />Project No. 115-143B <br />The Title ofthe Bid and Project Number (where applicable) oadescribed above must beincluded inthe <br />subject line of the email to which you have attached your bid. The name of the company/vendor,eddresa, <br />contact email address and phone number must be included in the body of the email. Detailed instructions <br />and information, including the link to the Reserved Mailbox for electronic bid submittals, ieavailable ot <br />anuthbendin.gov/bidn. <br />Work includes structural repairs and improvements at the Main & Colfax Parking Structure in South Bend, <br />all more particularly described in plans and specifications prepared by WGI, phone 269-381-2222. <br />The Contract Documents are on file and available for public inspection or purchase commencing on the <br />first advertise date during regular working hours at American Reprographics Company ("ARC", located at <br />13O3NorthoideB|vd.,8outhBend.|ndiana.46O15\.vvwxw.e-arc.com/|ooutinn/eouth.ben6/(574)287-2844. <br />toll free at(80O)783-7231.There will bmmnon-refundable charge for reproduction musell byARC h)revery <br />set of documents for all bidders. Additionally, the Contract Documents will be available that same day for <br />inspection atMAC|AF,212VV.Colfax Ave. South Bend, \N48SO1. <br />Electronic bids must be on the City of South Bend Contractors Bid for Public Work Form, accompanied by <br />an electronic copy of a Bid Bond or Certified Check in the amount of not less than five percent (5%) of the <br />base bid plus any alternates. The awarded bidder will be required to send the original check or bid bond <br />via LISPS. <br />Each bidder mcontractor (hereinafter the contractor)must comply with "City of South Bend EEO Contracting Provision <br />Diversity Utilization' included in the specifications as to each construction trade it intends to use on this construction <br />contract and all other construction work (both federal and non-federal) in the St. Joseph County area during the <br />performance ofthis contract orsubcontract. The contractor commits itself Uothe goals for minority manpower and all <br />other mquimmanim, tynno and conditions of these bid conditions by submitting a properly wna|ad bid. Woman and <br />Minority -Owned Business Enterprises (YWK4BE) are encouraged to respond to this notification. It is the ao|o <br />responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6- <br />63 of the Responsible Bidder Ordinance no later than the dote of the public bid opening. Please note: The City <br />reserves the right to request supplemental information provided by the bidder, and may also conduct random <br />inquiries of the bidder's current and previous customers regardless of pre -qualified status. <br />A Pre -Bid Conference will be held on April 1, 2020 at 11:00 a.m. Local Time live streamedthmugh the following <br />link, �LiprturlatJsTY-1. At the time of the meeting, follow the link to the event. If the live stream is not active, refresh the <br />page after a minute to allow the producer to begin the live stream. All questions shall be placed using the chat column <br />and will be answered after the agenda review. Questions will also be accepted in the form of email to <br />Vp!gL�,1�2c ail to (574)235-5998 after the live stream. Any questions about bidding conditions <br />must be addressed to the Owner in writing no later than April 9, 2020 at 3:00 p.m. Local Time. <br />The Board reserves the right to reject any orall bids mtoaccept efull mpartial award ofthe bid or bids which, inits <br />judgment, will betothe best interests ofthe City ofSouth Bend. Ifthe Board elects to award the base bid plus an <br />altemate(s), the Board will look at the totality of the cost when determining the lowest, responsive and responsible <br />bid. <br />BOARD OF PUBLIC WORKS <br />Linda M. Martin, Clerk <br />Publish two (2)times: <br />March 2O,2O2O <br />
The URL can be used to link to this page
Your browser does not support the video tag.