My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - Golf Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - Golf Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 12:09:32 PM
Creation date
4/16/2020 12:09:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q:June 1st seems like an aggressive schedule - assuming award / contract might take a week or <br />two that is a likely start date of May 1st-ish (not assuming any issues with starting due to Covid). <br />Assuming we have to wait for cure times for coating etc. - Is June 1st completion set in stone? <br />Q:Would like to know of the new time line could be extended to 8 weeks? <br />A: The project will have a substantial completion date of June 1 <br />July 3 and a final completion <br />dateof June 8 July 10. During all work, the Contractor may close Levels 4 and 5, maintaining a <br />drive lane up to Levels 6 and 7. The contract time will start when the Notice to Proceed is <br />delivered and signed. <br />Q:Is this a prevailing wage project and was the pre bid attendance mandatory? <br />A: No and No. <br />Q:Paint removal is down to bare concrete or just what is loose? <br />A: See Section 09 9100 – 5 in the specifications for expectation of preparing surfaces. <br />E. Preparation of coated and uncoated concrete surfaces: <br />1.Concrete surfaces shall be waterblasted as a minimum to remove contaminants <br />and loose paint. Scraping of the loose paint may be required. <br />2.Surfaces shall be cleaned, dry, and free of all contaminants such as dirt, dust, <br />laitance, grease, previously applied coatings and other contaminants that would <br />interfere with the adhesion of the specified coating system. <br />3.Properly prepared surfaces shall be dry prior to coating. <br />4.New concrete shall cure for minimum of 28 days prior to coating, or as <br />required by Manufacturer <br />Attachments: <br />Minority and Women Business Enterprise Diversity Development Program General <br />Conditions <br />Minority and Women Business Enterprise Diversity Development Program Forms <br />Typical Level Image <br />Wall Delamination Image <br />Unpainted Column Image <br />-This addendum consists of a total 10 pages inclusive of “Acknowledgement of Receipt of <br />Addendum” sheet- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.