Laserfiche WebLink
XXII. DIVISION 1: DELIVERY OF HMA MATERIALS BY TRI-AXLE TRUCK <br />A. Prevailing specifications Section: Bone <br />B. Additions: <br />1. The City of South Bend will coordinate hauling operations for all HMA materials <br />deliveries. Under certain circumstances, City vehicles may not be available to facilitate <br />HMA materials hauling operations and will require a contractor to supply truck(s) and <br />driver(s) to assist with hauling and delivery. <br />2. The City will assign through successful bidding process tri-axle trucks and drivers to <br />deliver HMA materials as designated to any point in the City. <br />3. The City will hire the truck(s) with driver(s) for a minimum of eight (8) hours per day. <br />4. Paving operations may require the use of the truck(s) and driver(s) for a time period <br />that exceeds an eight (8) hours workday. There will be no premium time paid for work <br />in excess of eight (8) hours per day. The City will make all attempts to coordinate <br />trucking needs and schedule working hours with the Contractor in advance of the date <br />work will be performed but flexibility in working hours shall be expected. <br />5. Multiple trucks and drivers may be needed to accommodate paving operations. <br />Contractors submitting a Unit Price for Division I should provide a list of fleet vehicles <br />available for hauling and the maximum amount of vehicles that would be available <br />during typical Monday through Friday operations. <br />6. Payment shall be made at the Unit Price of Per Hours as specified in the proposal. <br />Version 1/30/2020 Special Provisions - 14 <br />