Laserfiche WebLink
I ! <br /> (1) Within ninety (30) days following commencement of <br /> the introduction of wastewater into the wastewater system, <br /> monitoring report on forms furnished by the Board <br /> indicating the nature and concentration of all prohibited <br /> or rcgulated substanccs containcd in its discharge, and <br /> the average and maximum daily flow in gallons . The report <br /> are being met on a consistent basis, and if not, what <br /> additional operations, maintenance and/or pretreatment <br /> activities are nceessary to bring the discharger into <br /> compliance with the applicable standards .Within either 180 <br /> days after the effective date of a categorical <br /> pretreatment standard, or the final administrative <br /> decision on a category determination under 40 CFR <br /> 403 . 6 (a) (4) , whichever is later, existing significant <br /> industrial users subject to such categorical pretreatment <br /> standards, and currently discharging to or scheduled to <br /> discharge to the POTW, shall be required to submit to the <br /> Director a report which contains the information listed in <br /> Paragraph 2 below. At least ninety (90) days prior to <br /> commencement of their discharge, new sources, and sources <br /> that become industrial users subsequent to the <br /> promulgation of an applicable categorical standard, shall <br /> be required to submit to the Director a report which <br /> contains the information listed in paragraph 2 below. A <br /> new source shall also be required to report the method of <br /> pretreatment it intends to use to meet applicable <br /> pretreatment standards. A new source shall also give <br /> estimates of its anticipated flow and quantity of <br /> pollutants discharged. <br /> (2) The industrial user shall submit the information <br /> required by this section including: <br /> a. Identifying Information. The name and <br /> address of the facility including the name of the <br /> operator and owners . <br /> b. Wastewater Discharge Permits . A list of <br /> any environmental control wastewater discharge <br /> permits held by or for the facility. <br /> c . Description of Operations . A brief <br /> description of the nature, average rate of <br /> production, and standard industrial <br /> classifications of the operation (s) carried out by <br /> such industrial user. This description should <br /> include a schematic process diagram which <br /> indicates points of discharge to the POTW from the <br /> regulated processes . <br /> d. Flow Measurement . Information showing <br /> the measured average, or estimated, if approved by <br /> the Director, daily and maximum flow, in gallons <br /> per day, to the POTW from regulated process <br /> streams and other stream, as necessary, to allow <br /> use of the combined wastestream formula set out in <br /> 40 CFR 403 . 6 (e) . <br /> e . Measurement of Pollutants . <br /> 1 . Identify the categorical <br /> pretreatment standards applicable to <br />