Laserfiche WebLink
3. Also Lot 5, Plat of River Bend Addition to the City <br /> of South Bend, Portage Township, St. Joseph County, <br /> Indiana. More particularly described as follows: <br /> Beginning at the Northwest Corner of Lot 5; thence <br /> South 212.06' (feet) , (212.06' Plat) to the <br /> Southwest corner of Lot 5; thence East 128.02 ' <br /> (feet) , (127.52 ' Plat) , to the Southeast corner of <br /> Lot 5; thence North 211.99 ' (feet) , (211.96' Plat) <br /> along the West R/W line of South St. Joseph Street <br /> to the Northeast corner of Lot 5; thence West <br /> 127.80' (feet) , (127.67 ' Plat) , along the South R/W <br /> line of East Washington Street, back to the point <br /> of beginning. <br /> 4. An easement located in the Northwest Quarter of <br /> Section 12, Township 37 North, Range 2 East. <br /> A permanent easement located in the 95' (foot) <br /> right-of-way of St. Joseph Street, for construction, <br /> maintenance and use as a pedestrian tunnel beneath <br /> St. Joseph Street, connecting the College Football <br /> Hall of Fame and the Century Center. Part of a <br /> parcel of land as shown on the plat of River Bend <br /> Addition to the City of South Bend, St. Joseph <br /> County, Indiana, which is recorded in Plat Book 31, <br /> Page "R" in the Office of the Recorder of St. Joseph <br /> County, Indiana, more particularly described as <br /> follows: <br /> Commencing at the Northeast corner of Lot 5, River <br /> Bend Addition to the City of South Bend; thence <br /> South 32.95' (feet) along the West R/W line of St. <br /> Joseph Street to the point of beginning; thence East <br /> 30' (feet) in St. Joseph Street; thence South 8' <br /> (feet) ; thence East 65' (feet) to the East R/W line <br /> of St. Joseph Street; thence South 60' (feet) along <br /> the East R/W line of St. Joseph Street; thence West <br /> 65' (feet) in St. Joseph Street; thence South 8 ' <br /> (feet) ; thence West 30' (feet) , to the West R/W line <br /> of St. Joseph Street; thence North 76' (feet) ; back <br /> to the point of beginning. <br /> II. Century Center Portion. <br /> The Century Center Portion consists of the acquisition <br /> of and construction of improvements to the existing Century Center. <br /> The improvements will consist of replacing certain portions of the <br /> roof of the Century Center; renovations to exhibit and concourse <br /> areas; installation of updated audio-visual equipment and security <br /> and heating control systems; construction of an expansion to the <br /> -2- <br />