My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 09-12-86
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1980-1989
>
1986
>
RM 09-12-86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 3:18:02 PM
Creation date
10/1/2012 3:53:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend <br />Regular Me, <br />6. NEW BU <br />f . Co: <br />a <br />elopment Commission <br />- September 12, 1986 <br />( font . ) <br />Mrs. Kolata noted that the Bureau will be <br />sen ing out a mailing to all contractors in <br />order to increase the Bureau's contractor <br />list. <br />Upo a motion made by Mr. Piasecki, seconded <br />by 4r. Combs and unanimously carried, the <br />Coinnission approved an amendment to the <br />Emergency Repair Program Guidelines. <br />for <br />?lines for the South Bend Central <br />Area. <br />Mrs Kolata explained that when the Central <br />Business District, Monroe Park and East Bank <br />were merged into the South Bend Central <br />Development Area the Commission established <br />the Design Review Committee process and design <br />guidelines. To date the Committee has <br />operated with the existing design guidelines <br />that were in place for each of the three <br />separate areas. Before the Commission today <br />are revised guidelines for the entire area. <br />Ms. Matthews explained that the new guidelines <br />are broken down into various categories. The <br />first category is rehabilitation guidelines <br />for the downtown and East Bank for anything <br />occuring with existing structures or lots. <br />There are also separate new construction <br />guidelines for the downtown and the East Bank. <br />There are also guidelines for the Monroe Park <br />area which are divided into residential, <br />comnercial and industrial guidelines. The way <br />the guidelines differ from the existing ones <br />varies depending on the area. Within the <br />Central Business District the only guidelines <br />that have ever been in place were written in <br />1968. The guidelines have been revised to <br />inc ude the new aspects of rehabilitation as <br />wel as new construction within the Central <br />Business District. Within the East Bank the <br />guidelines are basically reiterating the <br />existing guidelines and are a little more <br />exp icit including some items that are <br />reqViired in design considerations and building <br />spe ifications for Redevelopment disposition <br />COMMISSION APPROVED AN <br />AMENDMENT TO THE EMERGENCY <br />PROGRAM GUIDELINES <br />
The URL can be used to link to this page
Your browser does not support the video tag.