My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Bids - Eagle Way Sewer Extension Proj No. 119-095
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Reject Bids/Quotes/Proposals
>
Rejection of Bids - Eagle Way Sewer Extension Proj No. 119-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 9:32:46 AM
Creation date
3/25/2020 10:40:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Kyle Silveus <br />SUBJECT: Eagle Way Sewer Extension, Project 119-095 <br />DATE: March 24, 2020 <br />On March 10, 2020 the Board of Public Works opened and read bids for the above project. <br />The bidders ranked as follows: <br />Bidder Bid Amount MBEMBE % Utilization <br />1. Indiana Earth, Inc. $239,444.56 1.29% <br />2. Ritschard Bros. Inc. $281,819.00 82.91 % <br />4. Walsh & Kelly, Inc. $304,130.00 0.97% <br />3. HRP Construction, Inc. $374,400.00 3.24% <br />The MBE/WBE goal was determined to be 21.12%. Indiana Earth reached out to 4 MBE/WBE <br />subcontractors and plans to utilize one on this project (1.53% of the base bid, 1.29% with the <br />bid alternate that is desired to be awarded). One subcontractor chose not to bid, while one <br />subcontractor and one supplier provided quotes, but Indiana Earth does not plan to use them <br />because they were not the low bidders for the work. The percentage of MBE/WBE utilization for <br />each contractor is listed in the table above. <br />Indiana Earth's bid included MWBE utilization at 1.53% of the base bid or 1.29% with alternate. <br />Walsh & Kelly's bid used one MWBE for traffic maintenance, equivalent to 1.21 % of base bid, or <br />$2,949. It rejected an MWBE material supplier for pipes and castings because it was "higher <br />than other quotes we receive." Indiana Earth disclosed that it obtained 4 quotes from MWBE's, <br />for concrete, manholes, and pipe, but that it was "not using those quotes." It did use the MWBE <br />bid for barricading of $3,100. <br />When factoring in the alternate, the next lowest bidder is a WBE entity (Would perform 90% of <br />the work) but their bid is beyond the budget for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.