My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA – General Environmental Consulting Services in Support of Redevelopment Efforts - Hull & Associates, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA – General Environmental Consulting Services in Support of Redevelopment Efforts - Hull & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:26:44 AM
Creation date
3/25/2020 10:25:54 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HULL <br />2020 STANDARD <br />Environment/Energy/Infrastructure BILLING RATE SCHEDULE <br />MANAGEMENT STAFF <br />SCIENTISTS <br />Senior Principal.......................................................................$260 <br />Principal Scientist ................................................................ <br />$180 <br />Principal.....................................................................................$185 <br />Senior Scientist .................................................................... <br />$150 <br />Senior Project Manager.......................................................$160 <br />Project Scientist................................................................... <br />$125 <br />ProjectManager...................................................................... <br />$140 <br />Scientist II.............................................................................. <br />$1 10 <br />Government 8. Community Relations ................................... <br />$1 15 <br />Scientist I............................................................................... <br />$100 <br />Project Data Specialist.......................................................$85 <br />ENGINEERS <br />SURVEY STAFF <br />Principal Engineer....................................................................$180 <br />Principal Surveyor .............................................................. <br />$160 <br />SeniorEngineer........................................................................ <br />$150 <br />Project Surveyor................................................................. <br />$125 <br />ProjectEngineer....................................................................... <br />$125 <br />Surveyor II............................................................................ <br />$105 <br />EngineerII.................................................................................. <br />$1 10 <br />Surveyor I................................................................................ <br />$90 <br />Engineer1............ ,......................... ........ ....... <br />$100 <br />Survey Crew Chief ................................................................ <br />$85 <br />SeniorDesigner........................................................................ <br />$1 15 <br />Survey Crew Member.......................................................... <br />$65 <br />DesignerII.................................................................................$100 <br />Survey Crew ........................................................................ <br />$150 <br />DesignerI.....................................................................................$85 <br />HYDROGEOLOGISTS <br />SUPPORT STAFF <br />Principal Hydrogeologist....................................................... <br />$180 <br />Senior GIS Specialist......................................................... <br />$125 <br />SeniorHydrogeologist...........................................................$1'50 <br />GIS Specialist ......................................................................... <br />$95 <br />Project Hydrogeologist..........................................................$125 <br />Senior Technician ................................................................... <br />$90 <br />HydrogeologistII..................................................................... <br />$1 10 <br />Technician II............................................................................. <br />$80 <br />HydrogeologistI......................................................................$100 <br />Technician I .............................................................................. <br />$65 <br />Project Management Assistant...........................................$60 <br />NOTES: <br />1, If personal vehicles are utilized, travel mileage is billed at the federal mileage reimbursement rate. If company -owned <br />vehicles are utilized, rental rates of $120/day, $350/week, or $1,000/month are used in lieu of travel mileage. If <br />rental vehicles are utilized, the actual cost of the rental and gasoline will be billed directly with no mark-up. <br />2. Air transportation fees are billed directly with no mark-up. <br />3. Project reimbursable expenses such as reproduction by vendors, overnight shipping, meals, and lodging associated with <br />travel or extended field activities, etc. are billed directly with no mark-up. <br />4. Field equipment rented from outside vendors is billed directly with no mark-up. Field equipment owned by Hull, <br />including individual equipment items or groupings of equipment such as sampling kits, are billed at competitive market - <br />equivalent rates for daily or weekly rental. <br />5. Subcontractors' fees are billed at a rate equal to the subcontractor fee multiplied by 1.15 to recover Hull's contractual <br />risk and associated operational expense. <br />6. Overtime for time worked on a project in excess of 8 hours/day is billed at 1.5 times the standard rate. <br />7. Higher hourly billing rates may apply for certain services such as rapid response consulting, Ohio Certified Professional, <br />expert witness services, etc. as agreed on a project -specific basis. <br />HULL 8. ASSOCIATES, LLC MARCH 2O20 <br />DUBLIN, OHIO SBI080.0001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.