Laserfiche WebLink
CASCADE ENGINEERING <br />Date: July 17, 2009 <br />P.O. No.: ISE15448 <br />LOADING AND UNLOADING TEST D: <br />Dates Tested: 07/06/09 - 07/07/09 <br />Description of Samples: <br />Part Description: <br />Sample Condition: <br />Test Procedure: <br />Test Method: <br />Number of Cycles: <br />Number of Specimens Tested: <br />Report No.:3182829GRR-001 C <br />Reference No.: 09-0603-202466 <br />Page 6 of 11 <br />96 Universal Gallon Cart <br />Production <br />The test was performed at room temperature with a <br />cycle time that simulates lift, dump and return in not <br />less than 8 seconds. The cart was loaded to 336 lbs. <br />(+15-0 lbs.) Note: ANSI standards require a load <br />specified on cart that is 336 lbs. <br />520 Cycles <br />One (1) 96 Gallon Cart <br />Acceptance Criteria: <br />Carts shall remain water tight and functional through 520 cycles. <br />Results: <br />Number of C cles Descri tion <br />0 Start of Test <br />520 TestCompleted - Pass <br />The submitted sample meets the acceptance level criteria. <br />