Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />E <br />DIVISION OF ENGINEERING <br />PAO <br />Project Number: 1 18-090 Project Name: Technology Resource Center Change Order #: 1 <br />DATE INITIATED: 2-18-20 BPW DATE„ 3-24-20 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Initial deduct of scope work plus some added materials including floor outlets and access control <br />panels for doorways. Total deduct-$46,055.00 <br />Added build -out of future tenant space, including time added to overall contract. <br />Total Add $260,861.00 <br />Attachments: (List documents support change — required) <br />See attached price additions. <br />_W <br />Amountof BIncrease/ ❑Decrease: $214,806.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0.00 8 Scope of Work <br />---- Current Percent of Change: 15.52 ❑Differing Site Conditions, Changed Conditions <br />❑ Conflicted Specifications and Drawings <br />.... ......... <br />... �. <br />El Failed Materials <br />New Total Amount: $ 1,599,079.00 <br />------ ❑ Error <br />....... <br />15.52 El Omission <br />Total Percent of Change: % ❑ Final Quantity Adjustment <br />`i 3 `t 3Z`1 fill -i T(d. Pew ° Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) (Srgnatur4 (Date) <br />REVIEWED BY: <br />Toy Villa 3• I L • Zo <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Zach Hurst <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Kara Boyles I ow <br />City Engineer (Print Name) (at 0 <br />