My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to Owner-Engineer Agreement – Additional Work Required by FERC for South Bend Dam 2020 - Christopher B. Burke Engineering, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to Owner-Engineer Agreement – Additional Work Required by FERC for South Bend Dam 2020 - Christopher B. Burke Engineering, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:38:28 AM
Creation date
3/25/2020 9:42:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />t� �9 III III � COST PROPOSAL FOR PROFESSIONAL SERVICES <br />PR(? LC INI°ORMATION <br />Project Name: South Bend Dam DSSMR Amendment Proposal Date: 12-Mar-20 <br />Project Location: South Bend, Indiana <br />Prepared for: City of South Bend, Indiana <br />Contact: Sue 1.len Doudiickc, P 1 i <br />13oa.cd of Pe.tblic Works <br />'A.`a 5 74-23.'.'i-5922 office <br />Fax:: <br />FinaH: <br />Prepared by: Christopher B. Burke Engineering, LLC <br />Contact: 3r.mrnn JI I tor„kc, I" III <br />PNC Center, Suite 1368 South <br />Tel: 317-266-8000 <br />115 West Washington Street <br />Fax:.3'fl 7-6,121-9`'306a <br />Indianapolis, Indiana 46204 <br />Email <br />FEE SUMMARY <br />(See following pages for Phase and Task details.) <br />CBBEL Labor <br />Subconsultant <br />Direct <br />Total <br />Phase <br />IIc[wription <br />Fees <br />Fees <br />Costs <br />Cost <br />1 )SST\M Amendment <br />S <br />12,765 <br />S 19,475 <br />S <br />S 32,240 <br />2 <br />S <br />S <br />S <br />$ <br />3 <br />S <br />5 <br />S <br />$ <br />4 <br />$ <br />$ <br />S <br />$ <br />5 <br />S <br />S <br />S <br />$ <br />6 <br />S <br />S <br />S <br />$ <br />7 <br />S <br />5 <br />$ <br />S <br />8 <br />S <br />S <br />$ <br />$ <br />9 <br />; <br />$ <br />$ <br />$ <br />S <br />$ <br />$ <br />Projccl Tolav S <br />12,765 <br />S 19,475 <br />$ <br />Subconsultant Support Summary <br />Subconsultant <br />Direct <br />Percentage of <br />Total <br />Firm <br />Work Deacriptk)n: <br />Fees <br />Costs <br />Total Fees <br />Cost <br />GUS <br />Undenvater.I_ivcfnspecuon S <br />4,275,00 <br />S! <br />133% <br />S 4,275,00 <br />LFA <br />bathyrnetdc Survey $ <br />15,20000 <br />5 <br />47.1°/ <br />' .4 15,200,00 <br />$ <br />S <br />$ <br />$ <br />S <br />S <br />$ <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />$ <br />$ <br />S <br />$ <br />Total Subconsultant Fees S <br />19,475,00 <br />5 <br />60,41, <br />$`= <br />Included in Project Total Above <br />
The URL can be used to link to this page
Your browser does not support the video tag.