Laserfiche WebLink
inspection will be performed during low flow conditions which may require <br />coordinating releases from the Twin Branch Hydroelectric Project. <br />Task 4 — Stakeholder Meeting and Coordination — CBBEL will participate in a <br />meeting with representatives from the City of South Bend, University of Notre <br />Dam, and Lawson -Fisher Associates, P.C. to discuss the project and coordinate <br />the submittal of the requested information to FERC. CBBEL anticipates <br />additional coordination with stakeholders throughout the project. <br />Task 5 — Gate Operation Certification — The Annual Spillway Gate Operation <br />Certificate must be completed each year. CBBEL staff will observe operation of <br />the three East Race gates by City staff and will assist in preparation of the <br />certificate to submit to FERC. It is expected that the certification will be part of <br />the 2020 DSSMR submitted to FERC in 2021. <br />Task 6 — Dam Safety Signage — Dam safety signage is proposed on the upstream <br />side of the Jefferson Boulevard bridge and downstream side of the Colfax Avenue <br />bridge. CBBEL will provide design assistance for mounting and securing the <br />signs. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: N/A. <br />C. The responsibilities of Owner are modified as follows: N/A <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation on a <br />time and material, aggregate not -to -exceed basis in accordance with Engineer's <br />standard charges for professional services: <br />Task 1: $4,000 <br />Task 2: $1,100 <br />Task 3:: 2,2(l0 <br />Task 4: $1,500 <br />Task 5: $800 <br />Task 6 : $2,600 <br />See the attached fee justification and subconsultant proposals. <br />The schedule for rendering services is modified as follows: <br />- Complete final DSSMP and DSSMR by April 1, 2020 <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers For EJCDC. All rights reserved. <br />