Laserfiche WebLink
South Bend <br />Regular Me, <br />6. NEW BU <br />d. Co: <br />elopment Commission <br />- March 28, 1986 <br />(Cont.) <br />Contractor Proposal Loan <br />Sarah Moody B &C Construction Co. $ 9,465.00 $ 5,000.00 (Federal) <br />418 W. Madison 2,000.00 (CD) <br />3,000.00 (Private) <br />Timothy Mathias Timothy Mathias $34,662.28 $17,400.00 (Federal) <br />1010 W. Washington 9,000.00 (CD) <br />9,600.00 (Private) <br />Mr. Hunt noted that Timothy Mathias, the owner <br />of the property at 1010 W. Washington, will <br />act as the general contractor. Mr. Matthias <br />has met the minimum general contractor <br />st dards. <br />Ms. Dea Andrews, South Bend Heritage, noted <br />that the Mathias house was moved from the <br />Mason's lot as part of a joint venture with <br />South Bend Heritage. <br />Upom a motion made by Mr. Combs, seconded by COMMISSION APPROVED BIDS <br />Ms. Auburn and unanimously carried, the AND LOANS IN CONNECTION <br />Co ssion approved bids and loans in WITH THE RENTAL REHAB LOAN <br />corniection with the Rental Rehab Loan Program PROGRAM AS LISTED ABOVE <br />as fisted above. <br />e. Rep6rt on bid openinq of March 24, 1986. <br />Ms. Matthews reported on the bids received for REPORT ON BID OPENING OF <br />Parcel E2 -15. Ms. Matthews pointed out the MARCH 24, 1986 FOR PARCEL <br />parcel on a map and identified it as the E2 -15 WITHIN THE SOUTH BEND <br />former Crescent Electric site at the corner of CENTRAL DEVELOPMENT AREA <br />Colfax and Niles Avenue. <br />A proposal was received from Robert V. <br />Bat east. His offering price was $169,250.00 <br />which is the minimum offering price. The <br />project cost is estimated at $2.2 - 2.3 <br />million. The project would be for a health <br />and lifestyle center for Memorial Health <br />Systems, Inc., consisting of a two story, <br />32,000 square foot building, and approximately <br />66 parking spaces. The building would be <br />located at the northwest corner of the <br />intersection with parking north of the <br />building. The exterior materials would be <br />metal curtain wall panels, face brick and <br />tinted glass. The projected completion date <br />is December 1986. A sketch of the proposed <br />project was distributed. <br />-5- <br />